project planning

Once a client confirms the prospect's co-ordinates we research our unrivalled Seismic archive and database which stretches back through almost 50 years of Niger Delta operations. The data base provides us with very detailed information for the planned project. Making use of our extensive map and satellite imagery database determines the ground conditions before scouting teams are deployed from our advanced logistics group into the field.

A typical team consists of a surveyor, an engineer and a community affairs manager supported by two or three 4WD vehicles. Scouting prospects by boat and helicopter where necessary.

During the scouting phase ground conditions are confirmed, identifying major logistical difficulties, safety hazards, available resources and potential infrastructure sites within the prospect area.

United Geophysical's team of seismologists then design the field grid geometry to client specifications and model the field of cover. On completion we determine our acquisition strategy for survey, drilling and recording operations.

At this stage we formalise our HSE, Community Affairs and Security plans specifically for the prospect.

Our HSE plan will identify the HSE team to be assigned to the project. The major hazards specific to the project and emergency response plans such as medivac procedures, all of which form the basis of the HSE case for the project.

Our CA plan will include a community employment strategy, community assisted projects, youth incentive schemes, crop assessment and compensation schemes. Communities and clans within the prospect area are identified and a series of meetings with the chiefs and leaders within the project area are scheduled.

Our Security plan establishes a prospect specific security management system and includes contingency planning.